docs: cycle 8 status — backlog exhausted, branch re-validated green

This commit is contained in:
Aurora
2026-06-05 09:49:22 -04:00
parent e9915ff43e
commit 26da8fa9b3

View File

@@ -44,6 +44,7 @@
- Any deploy. Any change to the live game server.
## Status log (agent appends here)
- 2026-06-05 09:47 EDT: CYCLE 8 — NO-OP / BACKLOG EXHAUSTED. Branch intact at e9915ff (local HEAD == origin/chore/overnight-pr-shakedown-20260605 == PR #595 head; MERGEABLE). origin/main unmoved at 7f845bc. ZERO open PRs updated since cycle 7 (12:46Z) — only draft #578 (LeseWerk, out of scope) sits ahead of the integration PR. Re-ran `gh pr diff | git apply --check` on all 5 borderline MERGEABLE candidates against the live branch: ALL still conflict at the same lines — #588 (package.json:8 + swarm-dispatch.ts:887), #558 (playground-hud.tsx:164 + claude-agent.ts:52), #565 (send-stream.ts:384), #549 (electron/main.cjs:162), #571 (dashboard-aggregator.test.ts:131 + .ts:1010). Everything else open is CONFLICTING (#557 #551 #503 #482 #469 #463 #461 #388 #371 #363 #351 #336 #301), draft (#578), Docker/judgment (#576 crawl4ai), risky major bump (#585 vitest 3→4), or out-of-scope (#563 i18n 934-strings). Re-ran `pnpm build` → GREEN (4.36s). No new commits beyond this docs line. Consolidated PR #595 stands at 23 validated PRs. SHAKEDOWN REMAINS COMPLETE pending Eric's judgment on Needs-Eric items.
- 2026-06-05 08:46 EDT: CYCLE 7 — NO-OP / BACKLOG EXHAUSTED. Branch intact at dc901c2 (local HEAD == origin/chore/overnight-pr-shakedown-20260605 == PR #595 head; MERGEABLE). origin/main unmoved at 7f845bc. Only PR updated since cycle 6 is draft #578 (LeseWerk reading-app prototype — out of scope per spec). Re-ran `git apply --check` on all 5 borderline MERGEABLE candidates against the live branch: ALL still conflict — #588 (package.json:8 + swarm-dispatch.ts:887), #558 (playground-hud.tsx:164 + claude-agent.ts:52), #565 (send-stream.ts:384), #549 (electron/main.cjs:162), #571 (dashboard-aggregator.test.ts:131 + .ts:1010). Everything else open is CONFLICTING (#557 #551 #503 #482 #469 #463 #461 #388 #371 #363 #351 #336 #301), draft (#578), Docker/judgment (#576 crawl4ai), risky major bump (#585 vitest 3→4), or out-of-scope (#563 i18n 934-strings). Re-ran `pnpm build` → GREEN (4.34s). No new commits beyond this docs line. Consolidated PR #595 stands at 23 validated PRs. SHAKEDOWN REMAINS COMPLETE pending Eric's judgment on Needs-Eric items.
- 2026-06-05 03:33 EDT: clone + spec created. Awaiting first cycle.
- 2026-06-05 04:42 EDT: CYCLE 2b complete. Integrated 2 more additive feature PRs: #450 (external memory provider browser — 10 unit/component tests pass, routeTree auto-regen) and #457 (Echo Studio scaffold, closes #447; dropped its e2e spec since repo lacks @playwright/test and all existing e2e specs already fail in baseline). Build GREEN, test 33 fail/686 pass (zero regressions, +10 from #450). Pushed 552ee7c. PR #595 now lists 20 PRs. Remaining Needs-Eric/large: #388 CONFLICTING, #469 (106 files) CONFLICTING, #549 too large, #503 CONFLICTING, #565 needs runtime verify. — CYCLE 2 (04:35)